Skip to main content

ISO 19650 certified · BSI ACP partner

BIM and digital twins for the Kingdom’s most demanding projects.

Design Zone builds the information model behind giga-projects, from the first brief to a live digital twin that runs the building after handover.

ProgrammingConceptual DesignDocumentationDetailed ProjectFabricationOperation & MaintenanceAnalysis4D Time / 5D CostRenovationConstruction LogicDemolition01 Programming0102 Conceptual Design0205 Documentation0503 Detailed Project0306 Fabrication0609 Operation & Maintenance0904 Analysis0407 4D Time / 5D Cost0710 Renovation1008 Construction Logic0811 Demolition11

Stage 01 / 11

Programming

Our Clients

TRUSTED BY SAUDI ARABIA’S LEADING DEVELOPERS
OUR APPROACH

From brief to digital twin

Saudi Arabia’s ISO 19650-certified BIM partner covering the entire AEC lifecycle, from EIR authoring at programming to TwinMs digital twin handover. Jeddah HQ · Amman · Cairo. Trusted by NEOM, ROSHN, Amaala, and Diriyah Gate.

  • 01BIM Modeling & CoordinationMulti-discipline LOD 300+
  • 02Digital Twin (TwinMs)BIM → IoT → CAFM
  • 03Virtual Design & Construction4D scheduling, 5D cost
  • 04Scan to BIM & HBIMAs-built + heritage capture
  • 05ISO 19650 ImplementationEIR, BEP, CDE, standards
  • 06Visualization (TwinMaq)Renders, panoramas, variants
Explore all services6 of 33 shown · +27 more across 11 stages
VISION 2030

Built for the Kingdom’s mandates.

Built to ISO 19650, Saudi Green ready, and architected for the digital twins Vision 2030 is asking for.

01

ISO 19650

Gov procurement mandate

EIR, BEP, CDE setup per ISO 19650-2 on every engagement.

100%ISO-aligned
02

Saudi Green

Net-Zero 2060

Energy analysis, carbon take-off, SGI reporting via integrated BIM/MEP.

SGIReporting
03

Heritage HBIM

Diriyah · AlUla · Historic Jeddah

Scan-to-BIM and retrofit analysis for heritage sites & At-Turaif.

LOD 400Capable
04

Digital Twin

Smart cities · CAFM/FM

Digital Twin handover via TwinMs + COBie + FM integration.

TwinMsProprietary
OUR PRODUCTS

Two platforms. Two industries. One team.

Cinematic 3D for off-plan developments. Photoreal flythroughs, floor-by-floor exploration, and live unit availability for every prospect.

  • Residential
  • Hospitality
  • Mixed-use
  • Office
  • Cinematic flythrough
  • 3D building tour
  • Floor exploration
  • Unit availability
  • Compare Units
  • Gallery
  • EN ↔ AR
0/96
Reserved · demo80 units still available
Inquiries · 30d · demo0
Avg session · demo0.0 min
Request a demo
twinmaq.com / Aleen-152
···
TwinMaq Aleen 152
WHY DESIGN ZONE

Built to the standard giga-projects demand.

5DIFFERENTIATORS · CERTIFIED
01 · STANDARDS

BSI

BSI Associate Consultant Programme partner.

Direct partnership with the publisher of ISO 19650. We co-author and apply the standards we work with — not just follow them.

02 · TRAINING

Autodesk

Autodesk Authorized Training Center.

Authorized by Autodesk across Revit, Civil 3D, Navisworks and BIM 360. The workflows we deliver with are transferred to your project and operations teams as part of every engagement.

03 · R&D

TwinMs / TwinMaq

Two proprietary platforms, engineered in-house.

TwinMs operations dashboard + TwinMaq cinematic 3D sales platform — built by our own software developers and BIM specialists. We ship code, not just models.

04 · CERTIFIED

ISO 19650

ISO 19650 certified information management.

Every engagement aligned with ISO 19650-2. EIR authoring, BEP, CDE setup, document control — the global standard for BIM information management is built into our default workflow.

05 · AI

AI-Augmented

AI integrated where it actually saves time.

From automated clash detection and quantity takeoff to AI-assisted code compliance and Arabic-native LLM workflows. We adopt AI pragmatically — only where it makes the deliverable faster, cheaper, or more accurate.

Endorsed by
BSI Associate Consultant Programme
Autodesk Authorized Training Center
FAQ

Frequently asked questions

For owners, developers and operators planning complex projects: how BIM and digital twins are delivered, governed and handed over.

How does a digital twin change the way a building is operated after handover?
A digital twin connects the as-built BIM model to live building data from IoT sensors, the BMS and the CMMS. Facility teams see energy, HVAC, water, alerts and assets in one place, trace a fault to the exact space and equipment, and plan maintenance from the model instead of from drawings. Our platform, TwinMs, runs this today at Dar Albadriyah in Riyadh across 216 sensor channels.
What makes a BIM model valuable after construction, not only during design?
The information requirements set at the start. Under ISO 19650 the owner's EIR defines the asset data the operator will need. We model to it and hand over a federated as-built model with COBie-structured asset data, so the facilities team receives every space, system and piece of equipment with its manufacturer, warranty and maintenance information, ready for CAFM or a digital twin.
How do you meet ISO 19650 requirements on Vision 2030 tenders?
Tender documents increasingly require ISO 19650 information management. We author the Exchange Information Requirements (EIR), the BIM Execution Plan (BEP) and the Common Data Environment (CDE) set-up, and run delivery to ISO 19650-2. Design Zone is ISO 19650 certified and a partner in the BSI Associate Consultant Programme.
Can TwinMs connect to our existing BMS, CAFM and IoT systems?
Yes. TwinMs connects to building systems over BACnet and Modbus, syncs work orders both ways with your CMMS, reads CCTV over ONVIF, and signs users in through SAML 2.0 with multi-factor authentication for enterprise IT. Asset data arrives structured from the BIM handover, so the twin starts from the building as built.
How do you coordinate one federated model across several consultants and contractors?
Each discipline keeps ownership of its own model. We federate them in Navisworks, run clash detection on a fixed cycle, and issue every clash as a BCF item to the responsible party until it is closed. From LOD 300 onwards the federated model is the single source of truth that drawings, quantities and site decisions come from.
Who owns the model and the asset data at handover?
Ownership and use rights are set in your appointment and your EIR, and we deliver to them. At handover you receive the federated model and the structured asset data, so your operator and any future consultant can use them without depending on Design Zone.
START YOUR PROJECT

Tell us about your project.

Share your project brief. A senior BIM lead will reply within 24 hours.

What happens next
  1. 1

    You send the inquiry

    60 seconds — name, email, scope brief.

  2. 2

    We respond within 24 hours

    A senior BIM lead reads your scope and replies — bilingual EN/AR.

  3. 3

    30-min consultation call

    Real conversation. EIR + BEP scope outline. ISO 19650 aligned.

24hResponse
55+Projects
60+Specialists
Project inquiry
Your data stays with us