Skip to main content
All services
Stage 04

Analysis

Where the model gets stress-tested before construction begins.

Analysis turns the LOD 300 model into a verification engine. Clash detection resolves discipline conflicts before site. Sustainability analysis validates SGI and energy targets. SBC compliance checks every code requirement — turning the model into proof of constructability before tender.

Typical duration4–8 weeks
Standards alignedISO 19650 · SBC · SGI
Output reports12+ analyses
Bilingual deliveryEN / AR
Three Services

What we deliver in this stage

04·A

Clash Detection & BIM Coordination

ISO 19650-22–4 weeks

Federated multi-discipline coordination via Navisworks. Every architectural-structural-MEP conflict identified, classified, and resolved before site work begins.

Deliverables
  • Clash report matrix (severity-classified)
  • Coordination meeting minutes
  • Resolved-clash audit trail
  • Federated Navisworks file (NWD)
START YOUR PROJECT

Tell us about your project.

Drop your details — a senior BIM lead will reach out.

What happens next
  1. 1

    You send the inquiry

    60 seconds — name, email, scope brief.

  2. 2

    We respond within 24 hours

    A senior BIM lead reads your scope and replies — bilingual EN/AR.

  3. 3

    30-min consultation call

    Real conversation. EIR + BEP scope outline. ISO 19650 aligned.

24hResponse
55+Projects
60+Specialists
Quick inquiry · 60 seconds
Your data stays with us