Skip to main content
All services
Stage 06

Fabrication

Where the model becomes manufacturer-ready geometry.

Fabrication is where LOD 400 shop drawings, prefab coordination, and CNC/machine files come from the BIM model itself. Steel, MEP modules, façade panels — modeled to the level a fabricator can manufacture from with zero remodeling.

Typical duration6–14 weeks
Standards alignedLOD 400 · ISO 19650-2
Output formatsDWG · NC · IFC
Bilingual deliveryEN / AR
Three Services

What we deliver in this stage

06·A

Shop Drawings (LOD 400)

ISO 19650-24–8 weeks

LOD 400 fabrication-ready shop drawings — steel, MEP, façade — modeled to the level a fabricator can manufacture from without remodeling.

Deliverables
  • Steel shop drawings (Tekla / Revit Steel)
  • MEP fabrication drawings (LOD 400)
  • Façade panel shop drawings
  • Connection & assembly details
START YOUR PROJECT

Tell us about your project.

Drop your details — a senior BIM lead will reach out.

What happens next
  1. 1

    You send the inquiry

    60 seconds — name, email, scope brief.

  2. 2

    We respond within 24 hours

    A senior BIM lead reads your scope and replies — bilingual EN/AR.

  3. 3

    30-min consultation call

    Real conversation. EIR + BEP scope outline. ISO 19650 aligned.

24hResponse
55+Projects
60+Specialists
Quick inquiry · 60 seconds
Your data stays with us