Skip to main content
All services
Stage 05

Documentation

Where the model produces every drawing, schedule, and spec the contractor needs.

Documentation is when the federated BIM model becomes paper. Construction drawings, BOQ, and technical specifications generate directly from the model — automatically synced, version-controlled, tender-ready. No more "model says one thing, drawings say another."

Typical duration6–12 weeks
Standards alignedISO 19650-2 · CESMM
Output documents300+ drawings
Bilingual deliveryEN / AR
Three Services

What we deliver in this stage

05·A

Construction Drawings (GA Set)

ISO 19650-24–8 weeks

General arrangement drawings — plans, sections, elevations, details — generated from the federated BIM model and synced on every revision.

Deliverables
  • GA drawing set (architectural + structural + MEP)
  • Detail drawings (LOD 350+ where required)
  • Drawing register & revision matrix
  • Tender-ready PDF + DWG packages
START YOUR PROJECT

Tell us about your project.

Drop your details — a senior BIM lead will reach out.

What happens next
  1. 1

    You send the inquiry

    60 seconds — name, email, scope brief.

  2. 2

    We respond within 24 hours

    A senior BIM lead reads your scope and replies — bilingual EN/AR.

  3. 3

    30-min consultation call

    Real conversation. EIR + BEP scope outline. ISO 19650 aligned.

24hResponse
55+Projects
60+Specialists
Quick inquiry · 60 seconds
Your data stays with us