Skip to main content
All services
Stage 02

Conceptual Design

Where form, footprint, and feel are tested before commitment.

Conceptual Design turns the brief into spatial decisions. Massing sets footprint and volume; options comparison structures tradeoffs against the EIR; concept visualization brings the model to a level the board can sign off on. Pressure-tests ROI and feasibility before LOD 300 begins.

Typical duration4–8 weeks
Standards alignedISO 19650-2 / SBC
Output documents8 deliverables
Bilingual deliveryEN / AR
Three Services

What we deliver in this stage

02·A

Massing & Site Studies

SBC 3042–3 weeks

Test footprint, volume, and orientation against the site's constraints — solar, wind, view corridors, code envelope — before committing to a design direction.

Deliverables
  • Site analysis report
  • 3D massing options (3–5 schemes)
  • Solar / shadow / wind studies
  • Code envelope compliance check
START YOUR PROJECT

Tell us about your project.

Drop your details — a senior BIM lead will reach out.

What happens next
  1. 1

    You send the inquiry

    60 seconds — name, email, scope brief.

  2. 2

    We respond within 24 hours

    A senior BIM lead reads your scope and replies — bilingual EN/AR.

  3. 3

    30-min consultation call

    Real conversation. EIR + BEP scope outline. ISO 19650 aligned.

24hResponse
55+Projects
60+Specialists
Quick inquiry · 60 seconds
Your data stays with us